Installation

When designing a ventilated gap over insulation installed vetrozaschita.Steny of timber to finish the siding when the reconstruction of existing houses of timber and logs for new construction or insulation is made by fixing mineral wool on the outside walls and trim decorative and protective coating of metal or vinyl siding. The order of installation: Attach the upright frame to a wooden beam. Recommended step counters 500, 600 or 1000 mm, which will mount the plate LAYNROK LITE vraspor without gaps. As elements of the framework most often used pieces of wood 50×50, 45h50, 30×50 mm. Install plate LAYNROK LITE in the space between the uprights. Fasten with outside of the top insulation layer windproof (fiberglass, fiberglass vapor barrier or membrane, such as TYVEK, JUTA) with rails.

Tamp an additional crate to create a ventilated gap and fixing tiles. Read additional details here: Whole Foods. Close the design of exterior cladding – siding, paneling and other sheet materials or of plate. On the inside retaining wall is necessary to provide a vapor barrier device. Vapor barrier film attached to a wall or wooden slats with metal runners. When mounting the film is laid horizontal panels with overlapping with the wall when the device perekrytiem.Karkasnye frame walls of mineral wool LAYNROK LITE installed in the space between the uprights of the framework.

Mounting steps: Install the framework of cross bars 50×100 or 100×100 with a step between the uprights 500-1000 mm. Place the plate in vraspor LAYNROK LITE space between the uprights. Reliable and efficient design is framed walls with the installation of insulation in two layers of "overlap" with overlapping gaps. Attach to the outside heater windproof membrane (Eg, TYVEK, JUTA), protects the structure from weather. Tamp an additional crate on top of windproof membrane. Between insulating materials and external cladding to improve durability design and prevent moisture accumulation is recommended that the air gap width of 20-25 mm.